The Fadhili Downstream Pipeline project involves the detailed engineering design and procurement of multiple pipelines, including a 34 km, 56-inch diameter pipeline from the Wasit Gas Plant to Fadhili, a 204 km, 56-inch pipeline from Fadhili to EWPS 01, a 40 km, 18-inch utility water pipeline, and a 22 km, 4-inch HDO pipeline. Completed between 2015 and 2019, this project significantly bolsters the gas distribution network in the region.