Strengthening Gas Networks: Master Gas Phase II Package II - Central Region Pipeline

The Master Gas Phase II Package II project focuses on the detailed engineering design, procurement, and construction of a 226 km, 46-inch underground pipeline, extending from Pump Station 06 near Riyadh to the Qassim Power Plant. Completed between 2015 and 2018, this pipeline enhances the gas distribution framework in Saudi Arabia.

Key Project Insights:

  • Type of Work: Engineering, Procurement, Construction
  • Period: Awarded in 2015, Completed in 2018
  • Location: Saudi Arabia
  • Value: USD 220.38 million

Project Highlights:

  • Integrated Design: Pipeline constructed parallel to the existing AYQS-1 pipeline for efficiency.
  • Comprehensive Scope: Includes construction of the ROW, pipeline, and 7 valve stations.
  • Advanced Systems: Features burn pits, a black powder filtration system, and corrosion inhibitor skids.
  • Seamless Crossings: Incorporates seven thrust bore/open cut road crossings.
  • Timely Delivery: Successfully completed on schedule, reinforcing regional gas supply.