Expanding Gas Capacity: MGS-I Booster Gas Compression Stations 3 & 5

As part of Saudi Arabia’s Master Gas System Expansion, this project played a critical role in meeting the increasing gas demand in the Central and Western regions. The development included the installation of pipelines and two Booster Gas Compression Stations (BGCS #3 and #5), designed to deliver 12.538 BSCFD of gas by 2020, ensuring energy security for the region.

Key Project Insights:

  • Type of Work: Pipeline installation and gas compressor station development
  • Period: 2014 – 2019
  • Location: Saudi Arabia
  • Value: USD 1.3 billion

Project Highlights:

  • Expanding Gas Delivery: Designed to meet the rising gas demand with a capacity of 12.538 BSCFD.
  • Strategic Compressor Stations: Construction of BGCS #3 and #5 to enhance gas compression and transportation efficiency.
  • Energy Infrastructure Growth: Installation of pipelines to support long-term gas distribution across the Central and Western regions.
  • Pioneering Engineering: Innovative design and execution, ensuring the project adhered to the highest engineering standards.
  • Comprehensive Expansion: A vital component of the broader Master Gas System, securing energy supply for decades.