Powering Reliability: Bachelor Camp 69/13.8 kV Distribution Substation

The Bachelor Camp Distribution Substation project covers the engineering, procurement, and construction of a 69 kV / 13.8 kV substation and associated switchyard, designed to supply reliable power to the Bachelor Camp from Ghazal Substation (GZGCP-1). The system includes 69 kV overhead transmission line integration, Gas-Insulated Switchgear (GIS), and step-down transformers for efficient power distribution, executed in full compliance with SEC and Saudi Aramco standards.

 

Key Project Insights:

  • Type of Work: Engineering, Procurement, Supply, Installation, Testing & Commissioning
  • Location: Haradh & Wyudahi
  • Value: SAR 44,125.00

Project Highlights:

  • End-to-End Infrastructure: Complete 69/13.8 kV substation with integrated switchyard and distribution.
  • Advanced Systems: GIS-based switching with dual transformers for efficient power conversion.
  • Full Engineering Scope: Design, drawings, vendor integration, and multi-stakeholder coordination.
  • Approved Procurement: Materials sourced from SEC-approved manufacturers.
  • Seamless Integration: End-to-end interfacing from OHTL to final distribution network.
  • Reliable Supply: Stable and efficient power delivery to Bachelor Camp.

Revolutionizing Offshore Assets

LAIC Industrial Company retrofitted excellence with the Globaltech I Offshore Installation project reshaping the landscape of offshore infrastructure and harnessing diverse techniques to elevate functionality and efficiency in the North Sea’s dynamic environment.