Revolutionizing Offshore Infrastructure: Aramco Juaymah SPM Installation

Embark on a remarkable journey with the Aramco Juaymah SPM Installation project, a transformational endeavour shaping offshore excellence. Commencing in March 2022 and continuing to the present day, this ongoing initiative is redefining industry standards.

Key Project Insights:

  • Type of Work: SPM Installation
  • Duration: March 2022 – Ongoing
  • Location: Kingdom of Saudi Arabia (KSA)
  • Windfarm: Juaymah Terminal
  • Vessel: To Be Confirmed

Project Highlights:

  • Setting Sail for Success: Installation of 4 x SPM buoys at Aramco’s Juaymah Terminal, enhancing operational efficiency and offshore capabilities.
  • Strategic Prowess: Impeccable project management, meticulous planning, and seamless execution driving each phase of the installation.
  • Supply Chain Mastery: Sourcing and procurement of materials and equipment to ensure optimal project implementation.
  • Unveiling the Seabed: Detailed seabed survey of existing installations to ensure precision and integration.
  • Subsea Engineering Excellence: Expert subsea works to safely disconnect chains of SPMs, paving the way for improvements.
  • Transitioning with Finesse: Efficiently changing out old SPMs with new, advanced solutions for heightened performance.
  • Optimizing Infrastructure: Relocating an already installed SPM to strategically enhance terminal capabilities.
  • Precision in Motion: Skilled crane operations orchestrating flawless equipment handling.
  • Documenting Excellence: Comprehensive as-built surveys and seamless handover, ensuring the project’s legacy.

Experience the Evolution

Witness a testament to innovation and precision as the Aramco Juaymah SPM Installation project shapes a future of offshore efficiency and prowess.